Your kitchen and labor are locked in. The only number still moving is materials and finishes, and that part is yours to shape. Pick a level for each item below and watch the total update. Every price is an estimate at our contractor pricing; you buy direct from our vendors with no markup from us.
Full project total, kitchen and both bathrooms
$0
- Kitchen renovationContracted
- Bathroom labor, both rooms
- Main bathroom materials
- Half bath materials
- Painting, both rooms
Start with a direction
Choose a starting point, then fine-tune any item. Your must-haves keep the linen hutch, the tiled shower floor and the honeycomb tile, and save everywhere else.
Included in labor
- Demo and haul-away, shared with your kitchen dumpster
- Soffit removal over the vanity
- Tile half wall removal and wall repair in the half bath
- Shower build, tile setting, and all setting materials (mud, thinset, grout)
- Plumbing hookups and rough plumbing supplies
- Electrical for new lighting, outlets and exhaust fan
- Vanity, toilet, mirror, door and wainscoting installation
- Project management and scheduling alongside the kitchen
You purchase
- Vanities, countertops and sinks
- Tile for the shower and floor
- Shower drain, shower pan or tiled-floor kit
- Shower head, valve trim and glass door
- Toilets, faucets and exhaust fan
- Light fixtures, mirrors and accessories
- Wainscoting materials
We plan every selection with you and pass along our vendor pricing.
Your timeline
- 2 weeksKitchen installation
- 5 daysBoth bathrooms, scheduled with the kitchen crew already on site
- One projectOne crew, one project manager, one point of contact